Copy-paste revision policy wording for freelance designers, copywriters and small studios: a full policy for a proposal or contract, a one-paragraph version for a quote, wording for logo, website and copy projects, an “unlimited revisions” clause with limits, and the email that restates it when the first draft goes out.
Updated
What a revision policy does
Revisions are part of the job. The trouble starts when nobody agreed how many, so every “one more small thing” is reasonable and the fourth round is as free as the first. A revision policy sets the number before any work exists, while both sides are still agreeable about it.
A policy that works answers four questions: how many rounds the price includes, what one round is, what is not a revision at all, and what happens when the rounds run out. Leave any of them unanswered and the client will answer it for you, generously.
It belongs in the document the client agrees to before you start: the proposal, the quote or the scope of work. Placeholders are in [square brackets]. Replace them and delete any line you don’t need.
Revision policy template
The full version, as six short clauses. It suits a proposal or a contract for a project of more than a few days.
Revision policy template
Revisions 1. Rounds included The price includes [2] rounds of revisions on each deliverable. 2. What a round is A round is one consolidated list of changes to one version, sent by [the approver named in this agreement] within [5] working days of receiving that version. Changes that arrive after the list has been sent count as the next round. 3. What a revision is A revision is a change within the agreed brief: wording, layout, colour, images or details. These are not revisions and are quoted separately: - A new concept, or a change of direction after one has been approved - Extra deliverables, pages, sizes or formats - Changes to work that has already been approved 4. Corrections Fixing my own errors, such as a typo I introduced or something that departs from the brief, does not use a round. 5. Further rounds Further rounds are charged at [rate per hour / fixed price per round]. I will tell you the cost before starting one. 6. Approval Each version is either approved or returned with changes. Once a version is approved in writing, revisions to it are closed and later changes are new work.
Clause 2 does most of the work. “Two rounds of revisions” means little if a round can be five separate emails over three weeks. Clause 4 is there for fairness: a client who has to spend a round on your typo will stop trusting the count.
Getting client work approved? Ratisfy puts it on one link instead of an email thread. Your client comments on the work, then approves or requests changes on the exact version, and never needs an account. Free for 3 active reviews.
Short revision policy for a quote
For a one-page quote, an order form or a service listing, where a numbered clause would be out of proportion.
Short revision policy
Revisions: [2] rounds are included. A round is one consolidated list of changes to one version. Further rounds are [rate], agreed before the work is done. Changes after written approval are new work.
Revision wording by type of work
The same policy reads differently by discipline, mostly because of where the expensive decisions fall. Set rounds per stage, so that approving a stage closes it.
Logo and brand identity
Revision wording for logo design
Revisions: logo and brand identity Concept stage: you will see [3] initial concepts and choose one direction. Choosing a direction is included. Further concepts are quoted separately. Refinement stage: [2] rounds of revisions to the chosen direction are included. Once the final logo is approved, changes to it are new work at [rate].
Website design
Revision wording for web design
Revisions: website design Design stage: [2] rounds of revisions to the page designs are included before the build starts. Build stage: [1] round of revisions is included after the site is built, for fixes and adjustments to what was designed. Changing an approved design once the build has started, and adding pages or features, are change requests and are quoted separately. Content supplied after [date] may move the launch date.
Copywriting
Revision wording for copywriting
Revisions: copywriting [2] rounds of revisions are included on each piece. Please send edits as comments or tracked changes on the draft, in one pass per round. A change to the brief, the audience or the angle after the first draft is a rewrite and is quoted separately. Corrections to facts you supplied are included at any point before approval.
Video follows the same pattern: rounds on the rough cut, fewer on the fine cut, and none after the client approves the final cut, when changes become new work.
“Unlimited revisions”, with limits
Some markets expect the phrase, and it does reassure a nervous first-time client. If you offer it, limit something other than the count: the time, the form the feedback takes, and what a revision is.
Unlimited revisions policy
Revisions: unlimited, within these limits You can request as many revisions as you need until [end date, for example 14 days after the first draft is delivered]. Each request is one consolidated list of changes to the current version. Revisions refine the agreed direction. A new direction, or new deliverables, is a new project. If I receive no changes within [7] days of sending a version, I will ask you to approve it or to tell me when your changes will arrive.
The last line asks for a decision and doesn’t assume one. Whether silence can ever count as approval depends on your agreement and the law where you work, so don’t rely on it unless your contract says so and a lawyer has seen it.
How many revision rounds to include
- Two rounds suit most design and copy projects. The first round collects the big reactions; the second settles the details.
- Three rounds make sense when several people review the work, or when the client has never commissioned this kind of work before.
- One round is enough for production work with a tight brief: resizing a set of ads, laying out supplied copy, a reprint with new dates.
- Per stage, not per project. On a staged project, give each stage its own rounds and close the stage with an approval. Six rounds “for the website” get spent on the homepage.
Price the rounds you include. If two rounds of changes typically take you a day, that day is part of the fee, and offering a third round free is a discount you chose to give.
What counts as a revision
Most arguments about rounds are really about this. Three kinds of change look alike from the client’s chair and should be treated differently.
- A revision adjusts work that is inside the brief and not yet approved: a different photo, a shorter headline, a warmer colour. It uses a round.
- A correction fixes something you got wrong: a typo you introduced, a missed instruction from the last round. It is free and uses no round.
- A change request moves the brief or reopens approved work: a new page, a different concept, a change to the logo after sign-off. It gets a price and a new date before you start. The change request emails cover that conversation.
Say which one a request is when it arrives, in a sentence. “These are covered, this is round 2 of 2” and “that one is outside what we scoped, so I’ll price it” are both easier to hear on the day than on the invoice.
Restating the policy with the first draft
A policy on page four of a proposal has been forgotten by the time the first draft arrives. Repeat it in four lines when you send that draft, which is the moment it starts to apply.
First draft email with revision policy
Subject: First draft of [deliverable]: how revisions work
Hi [Client name], The first draft of [deliverable] is ready: [link] A quick reminder of how revisions work on this project: - The price includes [2] rounds. Your first set of changes will be round 1 of [2]. - A round is one list of changes. Please collect everyone's comments and send them together by [day, date]. - When a version is right, reply "Approved" and I'll move on to [next step]. - Anything beyond the [2] rounds, or outside what we scoped, I'll price for you before I start it. Thanks, [Your name]
Asking for comments to be collected matters as much as the number. When a client’s whole team replies separately, see how to avoid design by committee.
Charging for extra rounds
Extra rounds go smoothly when the price was known before the project began and the client is told before the work starts, never after. Three ways to price them:
- Hourly. Fair for unpredictable changes. Give an estimate with it, so the client isn’t approving a blank cheque.
- A fixed price per round. Easier for the client to say yes to, and it rewards them for sending one tidy list.
- A quote for that round. Best when the “round” is really a small new piece of work.
You can always waive a round for a good client. Waive it out loud: “this would be a third round, and I’m including it this time” keeps the policy intact for the next project. A policy the client never saw is hard to rely on, so agree it before the work begins. What it commits either side to depends on that agreement and the law where you work. This page is not legal advice.
Counting rounds in the review itself
A policy is easiest to keep when the count is in front of the client at the moment they ask for changes. Ratisfy puts it there.
- Set how many revision rounds a review includes, from 1 to 50, or leave it blank for no limit.
- A round is used each time a version comes back with changes requested. A request the client withdraws is not counted.
- When you have set a number, the client is shown which round their request would be before they send it, and is told when it goes past the included number. They can still send it.
- A request for changes has to say what to change: in a note, or in an open comment on that version.
- Each new version you publish needs its own decision. An earlier approval stays in the history and never carries over.
- When you have set a number, your view of the review shows how many rounds are used.
Ratisfy counts the rounds and, when you have set a number, shows the count to you and to the client. It doesn’t stop a request that goes past the limit, and it doesn’t price the extra round for you. It records decisions; it is not a legal e-signature and does not replace your contract. Try a sample as the client, or see how Ratisfy works.
Revision policies: questions
What is a revision policy?
A revision policy is the part of a proposal, quote or contract that says how many rounds of changes the price includes, what counts as one round, what is not a revision at all, and what further rounds cost. It turns “a few tweaks” into something both sides can count.
How many rounds of revisions should a freelancer include?
Two rounds suit most design and copy projects: the first for the big reactions, the second for details. Include three when several people review the work or the project has stages, and one for small production jobs. Whatever the number, state it per deliverable or per stage, and say what a round is.
What counts as one round of revisions?
One consolidated list of changes to one version. If the client sends a list on Monday and two more changes on Wednesday, that is two rounds unless you agreed otherwise. Defining a round this way is what makes the number of rounds mean anything.
Should I offer unlimited revisions?
Only with limits on something else. “Unlimited” with no end date and no definition of a revision is an open-ended promise. If clients value the reassurance, limit the time, require one consolidated list per request, and say that a new direction is a new project.
How do I charge for extra revisions?
Put the price in the policy before the project starts, either an hourly rate or a fixed price per round. When the included rounds are used, tell the client which round the next one would be and what it costs, and start only after they agree.
What is the difference between a revision and a change request?
A revision adjusts work that is still inside the agreed brief and has not been approved yet. A change request alters the brief itself or reopens something already approved, so it has its own price and its own effect on the delivery date.
How does Ratisfy keep track of revision rounds?
You can set how many revision rounds a review includes, from 1 to 50, or leave it blank for no limit. A round is used each time a version comes back with changes requested, and a request the client withdraws is not counted. When you have set a number, the client is shown which round their request would be before they send it, and is told when it goes past the included number. They can still send it.
Put the round in front of the client.
Set the included revision rounds on a Ratisfy review. Before your client sends a request for changes, they are shown which round it would be, and each decision is recorded against the exact version. Free for 3 active reviews, and clients never need an account.